Commercial scaffolding in Albury Wodonga and Wagga Wagga
Scaffold that goes up when your schedule says it will, fits the building and passes inspection the first time.
Designed in-house · Built on Layher Allround · SWMS on every job
THE PROBLEM
Late scaffolding holds up every trade on a commercial build
On a commercial build, scaffold sits on the critical path. If it's not up, your roofers, renderers, painters and glaziers can't start. If it doesn't suit the building, you're paying for changes. If it fails an inspection, the site stops.
You need a commercial scaffolder who plans around your schedule, not one who turns up and works it out on the day.
1
In-house scaffold design and drawings
We start with your schedule and your building. Our in-house team works out the access each trade needs, designs the scaffold and draws it up for your approval.
2
Layher Allround modular scaffolding
Our crews build on the Layher Allround system. It's modular and lighter than tube and fitting, so it goes up faster and adapts easily as your job moves.
3
SWMS, inspections and OH&S audits
Every scaffold comes with site-specific SWMS, a toolbox talk for our crew and an in-house OH&S audit. Your site manager gets the paperwork without having to chase it.
WHAT WE BUILD
Types of commercial scaffolding we install
We build for builders and head contractors, schools and education departments, councils and civic buildings, commercial property owners and facility managers, and defence and government sites.
SCAFFOLDS WE BUILD
Full facade scaffold for re-roofing, recladding, rendering and painting
Perimeter scaffold
Stair towers and access towers
Cantilever and hanging scaffold over roofs, awnings and footpaths
Encapsulation and weather protection
Heritage and restoration scaffold
RECENT COMMERCIAL WORK
RAAF Base Wagga. Full facade scaffold for re-roofing a large building on an operating defence base. Designed in-house, approved by stakeholders and delivered on time, with minimal disruption to the base.
TESTIMONIALS
What they say about Masta Scaffold
-
“Great guys. Very reliable and flexible. Ensured a quality product with safe access to all areas of our site resulting in a successful build”
Thomas Horan
-
“Thanks for last minute help in getting scaffold up for my latest construction project just before Easter, friendly and efficient team, great to deal with”
Andrew Larson
-
“We have used Masta Scaffold on a number of large and small projects. Very easy to deal with, the Masta Scaff team went above and beyond for our intricate requirements.”
Ryan Maloney
COMMON QUESTIONS
Commercial scaffolding FAQs
Can't see your question? Call 0439 105 521 or send us your site details for a free quote.
-
As early as you can, ideally when you’re setting your schedule. The earlier we see the plans, the sooner we can design the scaffold and lock in crews for your start date.
-
Yes. Every job is designed in-house and drawn up for your approval before we build.
-
Yes. The Layher system is modular, so we can adapt it as trades move through. Each change is inspected before the scaffold goes back into use.
-
Scaffold must be inspected before first use, after any change or repair, after anything that could affect it (like a storm), and at least every 30 days. We handle the inspections and tags.
-
Yes. In NSW and Victoria, scaffold work where a person or object could fall more than 4 metres needs a high risk work licence. Our crews hold the licences for the work they do.
LET'S TALK
Got a commercial build coming up?
We work with builders, head contractors, councils and schools across Albury Wodonga, Wagga Wagga and regional NSW and Victoria. If you need a scaffold that's designed in-house, up before your trades arrive and down the day you're done, we'd love to hear about the job.